2ème projet ONAS : Date limite 18/01/2022 / Caution : 141 126 Dollars
carrying out of the study and works of the purification station of the industrial zone of Monastir and connection of raw water and purified water
- For the Equipment part: Have completed at least one wastewater treatment plant equipment project with an average daily flow rate greater than or equal to 2000 m3 / d.
- For the civil engineering part: Have achieved at least:
– a wastewater treatment plant project with an average daily flow rate greater than or equal to 1000 m3 / d
Or
– one (01) hydraulic works or engineering works for a total amount greater than or equal to five (05) million Tunisian dinars