2ème projet ONAS : Date limite 18/01/2022 / Caution : 141 126 Dollars

 

carrying out of the study and works of the purification station of the industrial zone of Monastir and connection of raw water and purified water

 

  1. For the Equipment part: Have completed at least one wastewater treatment plant equipment project with an average daily flow rate greater than or equal to 2000 m3 / d.

 

  1. For the civil engineering part: Have achieved at least:

– a wastewater treatment plant project with an average daily flow rate greater than or equal to 1000 m3 / d

Or

– one (01) hydraulic works or engineering works for a total amount greater than or equal to five (05) million Tunisian dinars