Projet SONEDE
1er projet SONEDE : Date limite 10/02/2022 / Caution : 370 000 Dollars
the design, construction and semi-industrial start-up (turnkey) of a 4 m3 / s surface water treatment complex in Béjaoua in the governorate of Manouba.
Series n ° 1: design and studies, supply of construction equipment, turnkey implementation, and semi-industrial start-up of a surface water treatment plant in Béjaoua with a nominal capacity of 4 m3 / s that can accept an overload of 25%.
Series n ° 2: design, construction, equipment of a break-load basin and treated water outlet from 2 reinforced concrete storage tanks for treated water with a capacity of 10,000 m3 each
Series n ° 3: study, supply of ductile iron pipes with a diameter of 1800 mm, valves, metering equipment and regulation and protection equipment, laying and installation work and tests for the discharge pipe of raw water with a diameter of 1800 mm in ductile iron on a linear distance of 1900 ml between the raw water pumping station and the treatment station